Conservative London Assembly candidate for Greenwich & Lewisham,
Charlie Davis, has responded to Transport for London’s (TfL) consultation on
the proposed extension of the Bakerloo line, urging them not to scrap the
existing connection to London Bridge as part of the further extension.
TfL were
consulting on plans to extend the Bakerloo line from Elephant and Castle to
Lewisham via Old Kent Old, with the possibility of a second extension to Hayes
and Beckenham junction – replacing the existing mainline rail service on the
line. However, these plans would mean that commuters on the Hayes line would no
longer be able to get a direct train to London Bridge.
Charlie responded to the consultation urging TfL to amend
their proposals and for the Bakerloo line to operate in addition to the
mainline train service. Charlie also raised this point at TfL’s exhibition in
Catford earlier in December 2019.
The concern
focuses on the fact that Lewisham Station is already at capacity during rush
hour, and removing the current Southeastern route from the Hayes line would
result in more commuters needing to change at Lewisham to access London Bridge
services. An alternative would be commuters changing at Embankment to access
the Circle or District line into the city.
Charlie said
“I am completely supportive of proposals to extend the Bakerloo line to
Lewisham, However, I do have a number of concerns surrounding the second phase
of the project. The best outcome for long suffering South East London
commuters, would be for TfL to extend the Bakerloo line beyond Lewisham but on
either a new track or dual track to enable commuters to maintain the London
Bridge connection. I have raised these concerns with TfL and look forward to
seeing their response”.
You can read Charlie’s full response here:
https://twitter.com/CDavisEltham/status/1208720482431913984.